A sample, not a client. Sample Software Company is a composite: every name and number is illustrative. What the $1k Map includes

T2C
T2CTechnology, delivered.
ClearPath Technology MapSample · Engineering lens · Sample Software Company

Sample Software Company

A B2B software company with a subscription product. 34 people, 12 engineers in three squads, a monolith and two services, weekly release target, two AI pilots under way.


This is a sample of the Engineering lens. The company is a composite and the numbers are illustrative, sized the way a real Map sizes them. Your Map uses your systems, your team, and your numbers, and stays confidential to you.

Engineering time found
22 hrs a week
about $90,000 a year of capacity
Return found
$24,000 a year
from one AI pilot that ships
Guarantee
Cleared
bar is 10 hours a week or $10,000 a year

1 · Your goals

"Ship on the date we say, every release."

"Stop finding bugs after the customer does."

"Know which AI work is worth funding."

2 · Your systems today

SystemWhat it does todayState
MonolithCore product, four years old. Billing and permissions live inside it.Tangled few tests around billing
Two servicesReporting and integrations, split out last year.Clean own repos and owners
PipelineBuilds and tests on every merge. Deploys to production.By hand one engineer runs the deploy
Tracker and reviewsTickets, pull requests, release notes.Uneven each squad works its own way
Support deskAbout 600 tickets a month, sorted by hand.By hand no link to the tracker
Two AI pilotsA support triage assistant and a code review assistant, each four months old.Stuck no owner, no measure

3 · How work moves today

IdeaProduct and sales requests
›
PlanScope changes mid sprint
›
BuildSquads code the change
›
ReviewPull requests wait 3 days
›
TestManual regression before release
›
ReleaseOne person deploys, often late
›
SupportCustomers find the defects

Green steps are where the time goes. Median cycle time, first commit to production, is 19 days. 5 of the last 12 releases shipped on the planned date.

4 · What is fragile

  • One engineer can deploy. When they are out, releases wait, and the last two slipped for that reason.
  • Billing has almost no tests. Every change to it is a held breath, and it is where 5 of 14 monthly escaped defects start.
  • The AI pilots have no owner. Each has a champion, neither has a decision maker, and neither has a measure of success.
  • The squads grew faster than the standards. Three definitions of done, so quality depends on who reviewed the change.
T2C
T2CTechnology, delivered.
ClearPath Technology MapSample Software Company · page 2

5 · Where the opportunities are

OpportunityWhat changesWorthMeasured by
A release cadence that holdsScope freezes at a set point, a second person can deploy, and a release checklist replaces memory.6 hrs a weekRelease predictability, 5 of 12 on time up to 10 of 12
Faster review and mergeReview turnaround is set at one working day, and changes stay small enough to review.5 hrs a weekCycle time, 19 days down to 8
Defects stopped before releaseTests go around billing first, then an automated regression pass replaces the manual one.11 hrs a weekEscaped defects, 14 a month down to 6
One standard across squadsOne definition of done and one review checklist, with a named owner for each service.Risk, not sizedEngineers able to ship a release, 1 up to 4
One AI pilot to productionThe support triage assistant gets an owner, a target, and a rollout. The code review assistant waits.$24,000 a yearAI initiative return, hours returned against run cost
Total found22 hrs a week
$24,000 a year

How the numbers were sized. 22 hours a week over 48 working weeks at an illustrative $85 an hour is about $90,000 of capacity. Defects: 8 fewer a month at about 6 hours each is 11 hours a week. Review waits: 12 engineers each lose about 25 minutes a week, 5 hours in all. AI: 600 tickets a month at 6 minutes of sorting, cut by two thirds, is about 480 hours a year at $50.

6 · What to do, in order

Quick wins · next two weeks

  1. Train a second engineer on the deploy and write the checklist. small
  2. Set a one day review turnaround and a pull request size limit. small
  3. Name one owner for each pilot and write down what success is. small

Bigger bets · in this order

  1. Tests around billing. Stops the most defects first. 3 to 4 weeks
  2. A release cadence with a scope freeze. Makes the date believable. 4 weeks
  3. One standard across squads, with service owners. 4 to 6 weeks
  4. Support triage assistant to production, once the cadence holds. 3 to 4 weeks

7 · What to leave alone

  • A rewrite or a move to microservices. The monolith's trouble is missing tests and unclear owners, and a rewrite carries both over. Fix those first and revisit in a year.
  • The code review assistant. Review is slow because of queue rules and large changes. Fix those and there is little left for AI to solve.
  • More tooling for the tracker. The three squads need one way of working before any new tool can help.

8 · How to get there

Recommended next step: Lead, with a Build for the billing tests. Several efforts need one owner who can set the standard, run the cadence, and decide what to fund and what to stop. It needs the CEO to back one standard across all three squads. The triage assistant starts with a person approving every action, and trust is extended one action at a time as the numbers hold.

Scope · weeks 1 to 2A leadership charter: the decisions in scope, the cadence, and the four numbers it is measured on.
Deliver · weeks 3 to 12Set the standard, put tests around billing, hold the release cadence, and take the triage assistant to production.
Run · month 4 onThe squad leads own the cadence and the measures. A plan hands the seat over when your team can hold it.
Sample only. Composite company, illustrative numbers.T2C · ClearPath Technology Map · $1,000 flat · guaranteed
Book a call