I was talking with a friend of mine last week and asked him what his lead time is.
Two to three weeks. That's a medium to large feature, from the requirement being written to running in production. His product group runs lean and follows almost the same process I do: the requirements document gets written, mockups if needed, and it runs through agentic dev teams.
Thinking back through my career, three to four months was a pretty good pace. After giving developers AI tools, that was cut almost in half. Though as I wrote in The Pinch Point, using AI only for development emptied the queue quickly (too quickly), and left a logjam in the pipeline after development.
What I've seen, and what my conversation confirmed, is that agentic pipelines have changed the game.
Most companies barely got to sprints
I know, sprints are old news. Everyone is agile, maybe. Many companies barely got there. Two week sprints, a planning meeting, a demo, a retro: for a lot of teams that's still the newest process they have, and it took years to adopt.
The sprint was built for a world where the developer's hours were the bottleneck. You planned two weeks of those hours, built, showed it, and planned the next two. A medium feature took several sprints, plus whatever had to happen before and after them to get those features to production.
That world is ending. When the building takes hours, planning in two week batches means the work spends most of its life waiting for the next batch.
What the pipeline looks like
In an agentic pipeline, the requirements document is the product the people make. It gets broken into tickets, and agents build, review, and test each one. A person approves what ships. Engineers are still responsible for the output, but they aren't writing the code anymore. They're managing the agents that write it.
The new agentic SDLC no longer needs to wait on people to do (most) of the work. Yes, you need to build and train the agent(s) at each workstation for this pipeline to flow, and it does take some time to build the factory; however, the results beat simply having faster horses.
Agentic pipelines enable us to focus more on what matters: thinking about what could be.
Enterprise doesn't get a pass
The fair objection: that works for a lean product group, not for a company with fifty teams, compliance reviews, and a change board.
That's the reason to do it, not the reason to skip it. A large company has more steps, more handoffs, more approvals. Every one of them is a station in the pipeline, and every one can be defined, measured, and run the same way. The job in an enterprise isn't to decide whether this pattern applies. It's to scale it. Measure it like a factory and the stations that slow you down stop hiding.
The companies that excel over the next few years will be the ones that know the old way won't cut it. Companies still trying to run two week sprints are not going to be able to compete.
How long does a medium feature take in your company, from idea to production?